Anda belum Log-in!
Silahkan Log in

Selamat Datang di Portal Digital Content Publisher
Jumat , 22 November 2024

Perpustakaan sebagai jantung pendidikan tinggi di Indonesia, harus mampu memberi kontribusi yang berarti bagi pelaksanaan proses belajar mengajar di perguruan tinggi.

TRUNOJOYO » Tugas Akhir & Skripsi » Teknologi Industri Pertanian
di-posting oleh 130331100003 pada 2017-08-10 14:50:58  •  209 klik

PERENCANAAN PERSEDIAAN BAHAN BAKU RAJUNGAN MENGGUNAKAN METODE MRP (MATERIAL REQUIREMENT PLANNING) (Studi Kasus : UD. GERALD UNEDO)
Inventory Planning of raw material with MRP (Material Requirement Planning) Method (Case Study: UD Gerald Unedo)

disusun oleh EKA WAHYUNI FAJRIYAH


SubyekManajemen Persediaan
Perencanaan dan pengendalian persediaan bahan baku
Kata KunciPersediaan
Lot For Lot

[ Anotasi Abstrak ]

Pengadaann bahan baku sering menjadi permasalahan dalam suatu industri. Pengadaan bahan baku yang baik dapat memperlancar jalannya suatu proses produksi sehingga kebutuhan dapat terpenuhi tepat waktu dan meminimalisasi biaya pengadaan. UD. Gerald Unedo yang terletak di Desa Sabiyan Bangkalan merupakan perusahaan yang bergerak di industri rajungan berproduksi sebagai pengulitan Rajungan. Pengadaan bahan baku metode perusahaan dilakukan berdasarkan apa yang biasa dilakukansebelumnya oleh perusahaan yaitu perusahaan akan memproduksi berapapun bahan baku yang tersedia pada suplier.Hasil yang telah dilakukan dengan metode MRP teknik Lot For Lot didapatkan biaya pemesanan sebesar Rp. 247. 470. 417 dan biaya penyimpanan sebesar Rp. 256. 700. 806 penghematan sebesar 44 % lebih hemat dibandingkan dengan metode perusahan.


Deskripsi Lain

The supply of raw materials is often a problem in an industry. Procurement of good raw materials can facilitate the running of a production process so that needs can be met on time and minimize procurement costs. UD. Gerald Unedo located in Sabiyan Bangkalan Village is a company engaged in the crab industry produces as a difficulty of Rajungan. Procurement of raw materials company method is done based on what used to be done before by the company that the company will produce whatever the raw materials available on suplier.a result has been done with the method of MRP techniques Lot For Lot method a obtained booking is fee of Rp. 247. 470. 417 and the storage fee of Rp. 256. 700. 806 savings of 44% greater than the method of the company.

Kontributor: Dr. MOH. FUAD FAUZUL M., S.TP, M.Si ; ASKUR RAHMAN, S.TP., MP
Tanggal tercipta: 0000-00-00
Jenis(Tipe): Text
Bentuk(Format): pdf
Bahasa: Indonesia
Pengenal(Identifier): TRUNOJOYO-Tugas Akhir-10928
No Koleksi: 130331100003


 Download File Penyerta (khusus anggota terdaftar)

 File PDF  1. TRUNOJOYO-Tugas Akhir -10928-130331100003-Abstract.pdf - 85 KB
 File PDF  2. TRUNOJOYO-Tugas Akhir-10928-130331100003_Cover.pdf - 1012 KB
 File PDF  3. TRUNOJOYO-Tugas Akhir-10928-130331100003_Chapter1.pdf - 17 KB
 File PDF  4. TRUNOJOYO-Tugas Akhir-10928-130331100003_Chapter2.pdf - 256 KB
 File PDF  5. TRUNOJOYO-Tugas Akhir-10928-130331100003_Chapter3.pdf - 251 KB
 File PDF  6. TRUNOJOYO-Tugas Akhir-10928-130331100003_Chapter4.pdf - 629 KB
 File PDF  7. TRUNOJOYO-Tugas Akhir-10928-130331100003_Conclusion.pdf - 85 KB
 File PDF  8. TRUNOJOYO-Tugas Akhir-10928-130331100003_Reference.pdf - 117 KB
 File PDF  9. TRUNOJOYO-Tugas Akhir-10928-130331100003_Appendices.pdf - 461 KB


 Dokumen sejenis...

     Tidak ada !

 Dokumen yang bertautan...





 Kembali ke Daftar