Anda belum Log-in!
Silahkan Log in

Selamat Datang di Portal Digital Content Publisher
Jumat , 03 October 2025

Perpustakaan sebagai jantung pendidikan tinggi di Indonesia, harus mampu memberi kontribusi yang berarti bagi pelaksanaan proses belajar mengajar di perguruan tinggi.

TRUNOJOYO » Tugas Akhir & Skripsi » Teknik Elektro
di-posting oleh 210431100082 pada 2025-10-02 01:10:15  •  11 klik

ANALISIS PENGARUH PENGGUNAAN BANK KAPASITOR TERHADAP RUGI-RUGI DISTRIBUSIPADA SISTEM PLTMH GUNUNG SAWUR 2 LUMAJANG
ANALYSIS OF THE EFFECT OF CAPACITOR BANK USAGEON DISTRIBUTION LOSSES IN THE GUNUNG SAWUR 2 MICRO-HYDRO POWER PLANT SYSTEM,LUMAJANG

disusun oleh ABDUL HAMID


SubyekRugi-Rugi Distribusi
Bank Kapasitor
Kata KunciBank kapasitor
rugi-rugi distribusi
power factor
ETAP
Hasil

[ Anotasi Abstrak ]

Penelitian inimenganalisis pengaruh penggunaan Bankkapasitor terhadap rugi-rugi distribusi pada sistempembangkit mikrohidro Gunung Sawur. Studi ini dilakukan untuk mengevaluasiefektivitas bank kapasitor dalam meningkatkan efisiensi sistem distribusi listrikdengan mengurangi rugi-rugi daya reaktif. Proses analisis dimulai dengan pengumpulanparameter dasar sistem, termasuk karakteristik generator, jenis kabel, dan beban, yangdiperoleh dari spesifikasi teknis serta pengukuran langsung di lapangan. Datayang diperoleh digunakan dalam perhitungan manual untuk menentukan parameterkunci seperti daya keluaran, efisiensi, dan kestabilan system kemudiandiimplementasikan dalam perangkat lunak ETAP guna melakukan simulasikelistrikan yang mencakup analisis aliran daya, kestabilan sistem, dan berbagaiskenario operasional dengan serta tanpa penggunaan Bank kapasitor. Dari hasilanalisis regulasi tegangan 8 dari 10 rumah melebihi batas SPLN sebesar 5,8%presentase terkecil hingga 16,7% presentase terbesar


Deskripsi Lain

This study analyzes the effect of capacitor bankusage on distribution losses in the Gunung Sawur micro-hydro power plantsystem. The research was conducted to evaluate the effectiveness of capacitorbanks in improving the efficiency of the electrical distribution system byreducing reactive power losses. The analysis process began with the collectionof basic system parameters, including generator characteristics, cable types,and loads, obtained from technical specifications well direct field measurements.The collected data were used in manual calculations to determine key parameterssuch output power, efficiency, and system stability, which were thenimplemented in ETAP software to perform electrical simulations. Thesesimulations included power flow analysis, system stability, and variousoperational scenarios both with and without the use of capacitor banks. Fromthe results of the voltage regulation analysis, 8 out of 10 houses exceeded theSPLN limit, ranging from the smallest percentage of 5.8% to the largestpercentage of 16.7%

Kontributor: Dian Neipa Purnamasari, S.ST., M.Tr.T.;Deni Tri Laksono, S.Pd., M.T.
Tanggal tercipta: 2025-09-15
Jenis(Tipe): Text
Bentuk(Format): pdf
Bahasa: Indonesia
Pengenal(Identifier): TRUNOJOYO-Tugas Akhir-38130
No Koleksi: 210431100082


Sumber :
Universitas Trunojoyo Madura

Relasi/Tautan:
Rugi-Rugi Distribusi Pada Jaringan Pembangkit Listrik

Ketentuan (Rights) :
2025

 Download File Penyerta (khusus anggota terdaftar)

 File PDF  1. TRUNOJOYO-Tugas Akhir-38130-Abstract.pdf - 12 KB
 File PDF  2. TRUNOJOYO-Tugas Akhir-38130-Cover.pdf - 1316 KB
 File PDF  3. TRUNOJOYO-Tugas Akhir-38130-Chapter1.pdf - 28 KB
 File PDF  4. TRUNOJOYO-Tugas Akhir-38130-Chapter2.pdf - 688 KB
 File PDF  5. TRUNOJOYO-Tugas Akhir-38130-Chapter3.pdf - 945 KB
 File PDF  6. TRUNOJOYO-Tugas Akhir-38130-Chapter4.pdf - 1992 KB
 File PDF  7. TRUNOJOYO-Tugas Akhir-38130-Conclusion.pdf - 112 KB
 File PDF  8. TRUNOJOYO-Tugas Akhir-38130-References.pdf - 81 KB
 File PDF  9. TRUNOJOYO-Tugas Akhir-38130-Appendices.pdf - 3429 KB


 Dokumen sejenis...

     Tidak ada !

 Dokumen yang bertautan...





 Kembali ke Daftar