Anda belum Log-in!
Silahkan Log in

Selamat Datang di Portal Digital Content Publisher
Kamis , 05 November 2026

Perpustakaan sebagai jantung pendidikan tinggi di Indonesia, harus mampu memberi kontribusi yang berarti bagi pelaksanaan proses belajar mengajar di perguruan tinggi.

TRUNOJOYO » Tugas Akhir & Skripsi » Teknik Elektro
di-posting oleh 130431100008 pada 2019-02-14 15:24:54  •  157 klik

ANALISA PERENCANAAN DAN PERANCANGAN SISTEM PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) SUMBER MARON DAN SENGKALING MALANG
PLANNING ANALYSIS AND DESIGN OF MICRO HYDRO POWER PLANT SYSTEM (PLTMH) MARON RIVER AND SENGKALING MALANG

disusun oleh MUHAMMAD FAJAR IHSAN


Subyek: PLTMH
Perencanaan PLTMH
Perancangan PLTMH
Seleksi Turbin
Generator
ELC (elektro load control)
Kata Kunci: PLTMH
Perencanaan PLTMH
Perancangan PLTMH
Seleksi Turbin
Generator
ELC (elektro load control)

[ Anotasi Abstrak ]

PLTMH yang merupakan Pembangkit Listrik Tenaga Mikro Hidro yang bergerak pada sistem Transmisi tegangan untuk mensuplay kebutuhan sehari-hari , PLTMH merupakan energi terbarukan yang telah di kembangkan di indonesia saat ini yang memanfaatkan aliran sungai sebagai faktor utamanya untuk menjalankan turbin yang akan memutar generator. Untuk lebih mengetahui prinsip kerja PLTMH peneliti menganalisa dua (2) Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) yang ada di Sumber Maro dan Sengkaling Malang. Rata-rata daya yang di hasilkan oleh ke dua pembangkit adalah 528 Kw untuk PLTMH Sumber Maron dan 1920 Kw untuk PLTMH Sengkaling Dalam produksi tegangan setiap harinya. Dalam perencanaan sebuah PLTMH terdapat faktor-faktor yang harus di ketahui sebelumnya diantaranya adalah penentuan debit air, perencanaan sebuah lokasi PLTMH, dan pemilihan Turbin yang sesuai pada lokasi penempatan PLTMH tersebut. Untuk biaya infrastruktur pembuatan PLTMH saat ini adalah Rp. 12.000.000 /KVA dan sudah termasuk biaya Panel, Turbin, Generator dan lainnya.


Deskripsi Lain

PLTMH, which is a Micro Hydro Power Plant that operates on a voltage transmission system to supply daily needs, PLTMH is a renewable energy that has been developed in Indonesia today which utilizes river flow as the main factor for running turbines that will rotate the generator. To find out more about the principle of PLTMH, the researchers analyzed two (2) Micro Hydro Power Plants (PLTMH) in Sumber Maro and Sengkaling Malang. The average power generated by the two plants is 528 Kw for PLTMH Sumber Maron and 1920 Kw for Sengkaling PLTMH In the production of voltage every day. In the planning of a PLTMH there are factors that must be known in advance including the determination of water discharge, planning of a PLTMH location, and selection of suitable turbines at the location of the PLTMH placement. For infrastructure costs, the current PLTMH is Rp. 12,000,000 / KVA and includes the cost of Panels, Turbines, Generators and others.

Kontributor: Miftachul Ulum S.T., M.T. ; Achmad Fiqhi Ibadillah S.T., M.Sc.
Tanggal tercipta: 2019-01-15
Jenis(Tipe): Text
Bentuk(Format): pdf
Bahasa: Indonesia
Pengenal(Identifier): TRUNOJOYO-Tugas Akhir-15523
No Koleksi: 130431100008


Sumber :
UNIVERSITAS TRUNOJOTO MADURA

Relasi/Tautan:
PLTMH; Perencanaan PLTMH; Perancangan PLTMH; Seleksi Turbin; Generator; ELC (elektro load control)

Cakupan (Coverage) :
PLTMH; Perencanaan PLTMH; Perancangan PLTMH; Seleksi Turbin; Generator; ELC (elektro load control)

Ketentuan (Rights) :
2019

 Download File Penyerta (khusus anggota terdaftar)

 File PDF  1. TRUNOJOYO-Tugas Akhir-15523-130431100008_ABSTRACT_TOC.pdf - 104 KB
 File PDF  2. TRUNOJOYO-Tugas Akhir-15523-130431100008_COVER.pdf - 603 KB
 File PDF  3. TRUNOJOYO-Tugas Akhir-15523-130431100008_CHAPTER 1.pdf - 131 KB
 File PDF  4. TRUNOJOYO-Tugas Akhir-15523-130431100008_CHAPTER 2.pdf - 847 KB
 File PDF  5. TRUNOJOYO-Tugas Akhir-15523-130431100008_CHAPTER 3.pdf - 1067 KB
 File PDF  6. TRUNOJOYO-Tugas Akhir-15523-130431100008_CHAPTER 4.pdf - 2137 KB
 File PDF  7. TRUNOJOYO-Tugas Akhir-15523-130431100008_CONCLUSION.pdf - 190 KB
 File PDF  8. TRUNOJOYO-Tugas Akhir-15523-130431100008_REFRENCES.pdf - 113 KB
 File PDF  9. TRUNOJOYO-Tugas Akhir-15523-130431100008_APPENDICES.pdf - 656 KB


 Dokumen sejenis...

     Tidak ada !

 Dokumen yang bertautan...





 Kembali ke Daftar