Anda belum Log-in!
Silahkan Log in

Selamat Datang di Portal Digital Content Publisher
Sabtu , 23 November 2024

Perpustakaan sebagai jantung pendidikan tinggi di Indonesia, harus mampu memberi kontribusi yang berarti bagi pelaksanaan proses belajar mengajar di perguruan tinggi.

TRUNOJOYO » Tugas Akhir & Skripsi » Industri
di-posting oleh 180421100115 pada 2023-01-14 09:01:53  •  208 klik

Optimasi Penjadwalan Produksi Box Hampers Guna Meminimasi Tardiness Menggunakan Metode Mixed Integer Programming (studi kasus: UMKM Ririk Souvenir Surabaya)
Optimization of Box Hampers Production Scheduling to Minimize Tardiness Using Mixed Integer Programming Methods (case study: UMKM Ririk Souvenir Surabaya)

disusun oleh MAKHRUS ALHABBI RIZKI


SubyekOptimasi
Penjadwalan Produksi
Kata KunciPenjadwalan produksi
Tardiness
Mixed Integer Programming
LINGO

[ Anotasi Abstrak ]

Usaha Mikro Kecil dan Menengah (UMKM) Ririk Souvenir Surabaya bergerak di bidang industri kerajinan yang menghasilkan produk hampers berbahan kayu. Produk yang diproduksi oleh UMKM Ririk Souvenir Surabaya ini bermacam-macam sesuai dengan pesanan konsumen. UMKM ini memproduksi barang secara Make To Order (MTO). UMKM Ririk Souvenir surabaya mempunyai permasalahan dibagian penjadwalan produksi yang menyebabkan keterlambatan produksi yang tidak sesuai dengan due date. Metode yang digunakan dalam penelitian ini adalah metode mixed integer programming. Pengerjaan metode mixed integer programming menggunakan aplikasi bantu bernama LINGO. Hasil dari metode mixed integer programmingmampu meminimasi waktu produksi sebesar 48,52 menit atau sebesar 1,6% dari waktu penjadwalan produksi di perusahaan.


Deskripsi Lain

Micro, Small, and Medium Enterprises (MSMEs) Ririk Souvenir Surabaya is engaged in the handicraft industry, which produces wooden hampers. The products produced by MSMEs Ririk Souvenir Surabaya vary according to consumer orders. MSMEs produce goods on a "make to order" (MTO) basis. MSMEs Ririk Souvenir Surabaya has problems in the production scheduling section, which causes delays in production that are not in accordance with the due date. The method used in this study is the mixed integer programming method. The mixed-integer programming method uses an auxiliary application called LINGO. The results of the mixed integer programming method are able to minimize production time by 48.52 minutes, 1.6% of the production scheduling time at the company.

Kontributor: Heri Awalul Ilhamsah, S.T., M.T.;Ika Deefi Anna, S.T., M.T.
Tanggal tercipta: 2022-08-18
Jenis(Tipe): Text
Bentuk(Format): pdf
Bahasa: Indonesia
Pengenal(Identifier): TRUNOJOYO-Tugas Akhir-26138
No Koleksi: 180421100115


Sumber :
Uiversitas Trunojoyo Madura

Ketentuan (Rights) :
2022

 Download File Penyerta (khusus anggota terdaftar)

 File PDF  1. TRUNOJOYO-Tugas Akhir-26138-Abstract.pdf - 8 KB
 File PDF  2. TRUNOJOYO-Tugas Akhir-26138-Cover.pdf - 343 KB
 File PDF  3. TRUNOJOYO-Tugas Akhir-26138-Chapter1.pdf - 95 KB
 File PDF  4. TRUNOJOYO-Tugas Akhir-26138-Chapter2.pdf - 214 KB
 File PDF  5. TRUNOJOYO-Tugas Akhir-26138-Chapter3.pdf - 245 KB
 File PDF  6. TRUNOJOYO-Tugas Akhir-26138-Chapter4.pdf - 462 KB
 File PDF  7. TRUNOJOYO-Tugas Akhir-26138-Conclusion.pdf - 8 KB
 File PDF  8. TRUNOJOYO-Tugas Akhir-26138-References.pdf - 77 KB
 File PDF  9. TRUNOJOYO-Tugas Akhir-26138-Appendices.pdf - 299 KB


 Dokumen sejenis...

     Tidak ada !

 Dokumen yang bertautan...





 Kembali ke Daftar