Anda belum Log-in!
Silahkan Log in

Selamat Datang di Portal Digital Content Publisher
Jumat , 06 November 2026

Perpustakaan sebagai jantung pendidikan tinggi di Indonesia, harus mampu memberi kontribusi yang berarti bagi pelaksanaan proses belajar mengajar di perguruan tinggi.

TRUNOJOYO » Tugas Akhir & Skripsi » Industri
di-posting oleh 190421100071 pada 2023-07-26 01:07:12  •  594 klik

Usulan Redesain Tata Letak Work In Process (WIP) Inventory Plant B untuk Meminimasi Jarak dan Ongkos Material Handling (OMH) menggunakan Pendekatan Systematic Layout Planning (SLP) (Studi Kasus: PT Aneka Timber dan Furniture)
Proposal Redesign Work In Process (WIP) Inventory Layout of Plant B to Minimize Distance and Material Handling Costs (MHC) with a Systematic Layout Planning (SLP) Approach (Case Study: PT Aneka Timber and Furniture)

disusun oleh NURUL ISLAMIYAH


Subyek: Perancangan Tata Letak Fasilitas
Kata Kunci: jarak
ongkos material handling (OMH)
systematic layout planning (SLP)
work in process (WIP) inventory

[ Anotasi Abstrak ]

Aliran perpindahan bahan pada plant B PT. Aneka Timber dan Furniture kurang efisien, yaitu terdapat aliran transportasi material handling yang berulang dan area penyimpanan yang terletak jauh dari workstation yang berkaitan menyebabkan jarak dan ongkos material handling (OMH) menjadi lebih besar. Hal tersebut dikarenakan tata letak fasilitas (mesin maupun area penyimpanan sementara) yang tidak sesuai dengan proses produksi. Maka dari itu penelitian ini melakukan redesain terhadap area work in process (WIP) inventory plant B sebagai solusi untuk mengurangi total jarak perpindahan bahan dan menghemat ongkos material handling (OMH). Redesain pada area tersebut dikarenakan tata letak fasilitas (mesin) tidak dapat dilakukan perubahan dikarenakan akan terjadi penambahan biaya jika dilakukan perubahan. Redesain WIP inventory plant B menggunakan pendekatan systematic layout planning (SLP). Layout usulan dari hasil redesain dilakukan pengukuran jarak menggunakan bantuan software visio dan perhitungan OMH untuk mengetahui perbedaan atau selisih terhadap layout aktual. Hasil yang diperoleh dari layout usulan pada parameter jarak diperoleh jarak perpindahan dalam satu bulan sebesar 105.509,76 meter dengan pengurangan dari layout aktual sebesar 17.802,24 meter atau sekitar 14,44%. Hasil yang diperoleh dari layout usulan pada parameter OMH diperoleh OMH dalam satu bulan sebesar Rp 11.028.764,77 dengan pengurangan dari layout aktual sebesar Rp 992.297,82 atau sekitar 8,25%. Hasil perhitungan jarak dan OMH layout usulan dengan metode SLP dinilai dapat meningkatkan efektivitas perpindahan material pada plant B dengan mempertimbangkan berbagai faktor dan batasan.


Deskripsi Lain

The flow of material movement at plant B PT. Aneka Timber and Furniture are less efficient, namely the existence of repeated material handling transportation routes and storage areas that are located far from the associated workstations causing distance and material handling costs (MHC) to be greater. This is because the layout of the facility (machinery and temporary storage) is not following the production process. Therefore, this study redesigned the work-in-process (WIP) inventory areas of plant B a solution to reduce the total distance of material movement and save on material handling costs (MHC). Redesign in that area because the layout of the facility (machine) cannot be changed because there will be additional costs if changes are made. Redesigning the WIP inventory of plant B using a Systematic Layout Planning (SLP) approach. The proposed layout from the results of the redesign is measured by measuring the distance using Visio software and MHC calculations to find out differences discrepancies with the actual layout. The results obtained from the proposed layout on the distance parameter obtained the displacement distance in one month of 105.509,76 meters with a reduction from the actual layout of 17.802,24 meters around 14.44%. The results obtained from the proposed layout on the MHC parameters obtained MHC in one month of IDR 11.028.764,77 with a reduction from the actual layout of IDR 992.297,82 around 8.25%. The results of calculating the distance and layout of the proposed OMH using the SLP method are considered to be able to increase the effectiveness of material transfer at plant B by considering various factors and limitations.

Kontributor: Rullie Annisa,S.T,M.T;Dr. Nachnul Ansori,S.T,M.T
Tanggal tercipta: 2023-07-12
Jenis(Tipe): Text
Bentuk(Format): pdf
Bahasa: Indonesia
Pengenal(Identifier): TRUNOJOYO-Tugas Akhir-28493
No Koleksi: 190421100071


Sumber :
Universitas Trunojoyo Madura

Ketentuan (Rights) :
2023

 Download File Penyerta (khusus anggota terdaftar)

 File PDF  1. TRUNOJOYO-Tugas Akhir-28493-Abstrak.pdf - 183 KB
 File PDF  2. TRUNOJOYO-Tugas Akhir-28493-Cover.pdf - 620 KB
 File PDF  3. TRUNOJOYO-Tugas Akhir-28493-Chapter1.pdf - 195 KB
 File PDF  4. TRUNOJOYO-Tugas Akhir-28493-Chapter2.pdf - 413 KB
 File PDF  5. TRUNOJOYO-Tugas Akhir-28493-Chapter3.pdf - 206 KB
 File PDF  6. TRUNOJOYO-Tugas Akhir-28493-Chapter4.pdf - 655 KB
 File PDF  7. TRUNOJOYO-Tugas Akhir-28493-Conclusion.pdf - 182 KB
 File PDF  8. TRUNOJOYO-Tugas Akhir-28493-References.pdf - 284 KB
 File PDF  9. TRUNOJOYO-Tugas Akhir-28493-Appendices.pdf - 249 KB


 Dokumen sejenis...



 Dokumen yang bertautan...





 Kembali ke Daftar