Anda belum Log-in!
Silahkan Log in
Selamat Datang di Portal Digital Content Publisher
Jumat , 06 November 2026
Perpustakaan sebagai jantung pendidikan tinggi di Indonesia, harus mampu memberi kontribusi yang berarti bagi pelaksanaan proses belajar mengajar di perguruan tinggi.
di-posting oleh 190421100089 pada 2023-08-07 08:08:24 • 237 klik
USULAN PERBAIKAN PENJADWALAN PROYEK MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM) DAN CRASHING (Studi Kasus: Produksi Tangki di PT. Metal Hitech Engineering)
PROJECT SCHEDULING PROPOSAL IMPROVEMENT USING CRITICAL PATH METHOD (CPM) AND CRASHING METHOD (Case Study: Tank Production at PT. Metal Hitech Engineering)
disusun oleh LOWINCE VALLERINA SIHITE
| Subyek: | Manajemen Industri Manajemen proyek |
| Kata Kunci: | Penjadwalan proyek Critical Path Method (CPM) jalur kritis percepatan lembur biaya |
[ Anotasi Abstrak ]
Keterlambatan proyek merupakan hal yang tidak diinginkan setiap perusahaan sehingga untuk mengatasi permasalahan keterlambatan tersebut perusahaan melakukan manajemen proyek dengan cara menyusun penjadwalan proyek. Penelitian ini dilakukan untuk menyusun penjadwalan proyek pada keterlambatan produksi tangki di PT. Metal Hitech Engineering. Pembuatan tangki tipe transport dengan ukuran 15 ton mengalami keterlambatan selama 60 hari dari target awal produksi yaitu 90 hari. Keterlambatan ini disebabkan oleh kurangnya jumlah pekerja. Penelitian ini melakukan penyusunan jadwal proyek menggunakan metode Critical Path Method (CPM) dengan bantuan Microsoft Project 2019 guna melihat jalur kritis yang menyebabkan keterlambatan. Jalur kritis ini kemudian dipercepat (crashing) dengan alternatif penambahan jam kerja lembur. Ada tiga alternatif solusi percepatan yang digunakan yaitu penambahan jam lembur sebanyak 1 jam, penambahan jam lembur sebanyak 2 jam, dan penambahan lembur sebanyak 3 jam. Ketiga alternatif solusi percepatan ini kemudian dibandingkan dari segi waktu dan biaya untuk menemukan alternatif solusi terbaik untuk permasalahan keterlambatan produksi akibat kekurangan pekerja yang dialami oleh PT. Metal Hitech Engineering.
Deskripsi Lain
Project delay is something that every company does not want so that to overcome the delay problem the company carries out project management by preparing project scheduling. This research was conducted to develop project scheduling on tank production delays at PT Metal Hitech Engineering. The manufacture of a transport type tank with a size of 15 tons was delayed for 60 days from the initial production target of 90 days. This delay is caused by the lack of workers. This research compiles a project schedule using the Critical Path Method (CPM) with the help of Microsoft Project 2019 to see the critical path that causes delays. This critical path is then crashed with the alternative of adding overtime working hours. There are three alternative crashing solutions used, namely adding overtime hours by 1 hour, adding overtime hours by 2 hours, and adding overtime by 3 hours. These three alternative crashing solutions are then compared in terms of time and cost to find the best alternative solution to the problem of production delays due to lack of workers experienced by PT Metal Hitech Engineering.
| Kontributor | : Dr. Kukuh Winarso, S.Si., M.T., IPM.,Asean Eng; Fitri Agustina, S.T., M.T. |
| Tanggal tercipta | : 2023-07-18 |
| Jenis(Tipe) | : Text |
| Bentuk(Format) | |
| Bahasa | : Indonesia |
| Pengenal(Identifier) | : TRUNOJOYO-Tugas Akhir-29078 |
| No Koleksi | : 190421100089 |
Sumber :
UNIVERSITAS TRUNOJOYO MADURA
Ketentuan (Rights) :
2023
Download File Penyerta (khusus anggota terdaftar)
1. TRUNOJOYO-Tugas Akhir-29078-Abstrak.pdf - 9 KB
2. TRUNOJOYO-Tugas Akhir-29078-Cover.pdf - 413 KB
3. TRUNOJOYO-Tugas Akhir-29078-Chapter1.pdf - 87 KB
4. TRUNOJOYO-Tugas Akhir-29078-Chapter2.pdf - 227 KB
5. TRUNOJOYO-Tugas Akhir-29078-Chapter3.pdf - 143 KB
6. TRUNOJOYO-Tugas Akhir-29078-Chapter4.pdf - 2090 KB
7. TRUNOJOYO-Tugas Akhir-29078-Conclusion.pdf - 16 KB
8. TRUNOJOYO-Tugas Akhir-29078-References.pdf - 139 KB
9. TRUNOJOYO-Tugas Akhir-29078-Appendices.pdf - 92 KB
Dokumen sejenis...Tidak ada !
Dokumen yang bertautan...Tidak ada !
Kembali ke Daftar 