Anda belum Log-in!
Silahkan Log in

Selamat Datang di Portal Digital Content Publisher
Kamis , 05 November 2026

Perpustakaan sebagai jantung pendidikan tinggi di Indonesia, harus mampu memberi kontribusi yang berarti bagi pelaksanaan proses belajar mengajar di perguruan tinggi.

TRUNOJOYO » Tugas Akhir & Skripsi » Industri
di-posting oleh 190421100011 pada 2023-08-09 08:08:09  •  380 klik

Penerapan Metode EOQ (Economic Order Quantity) Probabilistik Untuk Mengendalikan Untuk Mengendalikan Persediaan Bahan Baku (Studi Kasus : UMKM Pesona Batik Jombang)
Application of the Probabilistic EOQ (Economic Order Quantity) Method for Controlling Raw Material Inventories (Case Study: UMKM Pesona Batik Jombang)

disusun oleh NURUL HIDAYAH


Subyek: Pengendalian persediaan
metode EOQ probabilistik
reorder point
inventory.
Kata Kunci: Pengendalian persediaan
metode EOQ probabilistik
reorder point
inventory.

[ Anotasi Abstrak ]

UMKM Pesona Batik Jombang merupakan UMKM industri kerajinan batik yang berlokasi di Jombang. UMKM tersebut memproduksi beberapa motif batik, secara make to stock. Permasalahan yang terjadi yaitu pada persediaan bahan baku kain, karena pada UMKM tersebut selama ini dalam persediaan bahan baku hanya menggunakan perkiraan sehingga sering terjadinya ketidaktersediaan bahan baku. Metode EOQ (Economic Order Quantity) probabilistik merupakan salah satu metode yang akan digunakan untuk pengendalian persediaan pada UMKM tersebut. Metode EOQ dapat mencapai tingkat persediaan seminimum mungkin, biaya yang rendah dan mutu yang lebih baik. Hasil dari perhitungan EOQ yaitu pada iterasi 8 memiliki nilai persamaan optimal sebesar 10.621 cm dengan 1 kali pesan, pada perhitungan safety stock didapatkan hasil 818.02 cm, hasil dari perhitungan reorder point sebesar 3.947 cm. Hasil dengan menggunakan perhitungan EOQ probabilistik diperoleh hasil sebesar Rp. 785.750, dan perhitungan total cost pada UMKM Pesona Batik Jombang sebesar Rp. 1.988.867. Hasil tersebut terdapat selisih yaitu sebesar Rp.1.203.117, sehingga dapat disimpulkan bahwa metode EOQ probabilistik cocok diterapkan pada UMKM Pesona Batik Jombang, dan dapat meminimalisirkan biaya pada persediaan bahan baku.


Deskripsi Lain

UMKM Pesona Batik Jombang is an UMKM batik craft industry located in Jombang. These SMEs produce several batik motifs, on a make to stock basis. The problem that occurs is in the supply of raw materials for fabrics, because in these SMEs so far the supply of raw materials only uses estimates so that there is often an unavailability of raw materials. The probabilistic EOQ (Economic Order Quantity) method is one of the methods that will be used for inventory control in these SMEs. The EOQ method can achieve minimum inventory levels, lower costs and better quality. The result of the EOQ calculation is that in iteration 8 it has an optimal equation value of 10.621 cm with 1 message, the safety stock calculation results are 818.02 cm, the result of the reorder point calculation is 3.947 cm. The results of calculating the total cost of Rp. 785.750, the result of calculating the total cost of the Pesona Batik Jombang UMKM is Rp. 1.988.867. The results of the total cost using the probabilistic EOQ with the total cost of Pesona Batik Jombang UMKM is a difference of Rp.1.203.117, so it can be concluded that the probabilistic EOQ method is suitable to be applied to Pesona Batik Jombang SMEs, and can minimize costs in raw material supplies.

Kontributor: Heri Awalul Ilhamsah, S.T., M.T. Ida Lumintu, S.T., M.T, PhD.
Tanggal tercipta: 2023-07-20
Jenis(Tipe): Text
Bentuk(Format): pdf
Bahasa: Indonesia
Pengenal(Identifier): TRUNOJOYO-Tugas Akhir-29158
No Koleksi: 190421100011


Sumber :
Universitas Trunojoyo Madura

 Download File Penyerta (khusus anggota terdaftar)

 File PDF  1. TRUNOJOYO-Tugas Akhir-29158-190421100011_Abstract.pdf - 66 KB
 File PDF  2. TRUNOJOYO-Tugas Akhir-29158-190421100011_Cover.pdf - 357 KB
 File PDF  3. TRUNOJOYO-Tugas Akhir-29158-190421100011_Chapter1.pdf - 77 KB
 File PDF  4. TRUNOJOYO-Tugas Akhir-29158-190421100011_Chapter2.pdf - 234 KB
 File PDF  5. TRUNOJOYO-Tugas Akhir-29158-190421100011_Chapter3.pdf - 263 KB
 File PDF  6. TRUNOJOYO-Tugas Akhir-29158-190421100011_Chapter4.pdf - 311 KB
 File PDF  7. TRUNOJOYO-Tugas Akhir-29158-190421100011_Conclusions.pdf - 8 KB
 File PDF  8. TRUNOJOYO-Tugas Akhir-29158-190421100011_References.pdf - 13 KB
 File PDF  9. TRUNOJOYO-Tugas Akhir-29158-190421100011_Lampiran.pdf - 145 KB


 Dokumen sejenis...

     Tidak ada !

 Dokumen yang bertautan...





 Kembali ke Daftar