PERANCANGAN PROSEDUR KESIAPAN KERJA OPERATOR ALAT SHIP TO SHORE (STS) BERDASARKAN HUMAN RELIABILITY ASSESSMENT GUNA MENURUNKAN RISIKO HUMAN ERROR (Studi Kasus : PT Terminal Teluk Lamong)
DESIGN OF WORK READINESS PROCEDURE FOR SHIP TO SHORE (STS) EQUIPMENT OPERATORS BASED ON HUMAN RELIABILITY ASSESSMENT TO REDUCE THE RISK OF HUMAN ERROR (STUDY CASE: PT TERMINAL TELUK LAMONG)

disusun oleh TITA ZAHROTUNNISA`


SubyekHUMAN RELIABILITY ASSESSMENT
PROSEDUR KESIAPAN KERJA
Kata KunciKata Kunci HRA
HEART
SPAR-H
FTA
Prosedur Kesiapan Kerja

[ Anotasi Abstrak ]

Proses bongkar muat PT Terminal Teluk lamong beroperasi selama 24 jam selama 7 hari yang dilengkapi dengan beberapa alat berat crane dalam proses bongkar muat. Alat berat crane merupakan peralatan kritis pada proses kegiatan bongkar muat petikemas di PT Terminal Teluk Lamong berupa Ship To Shore (STS). Produktivitas STS sangat bergantung pada tenaga manusia sebagai operator yang menjalankan. Selama proses pengoperasian, peralatan tersebut rentan berisiko terjadinya human error. Guna mencegah adanya risiko human error terjadi maka dilakukan adanya pengukuran tingkat keandalan operator STS menggunakan metode Human Reliability Assessment menggunakan metode Human Error Assessment and Reduction Technique (HEART) dan Simplified Plant Analysis Risk Human Reliability (SPAR-H). Penggambaran pola kegagalan dilakukan dengan menggunakan metode Fault Tree Analysis (FTA) agar dapat menggambarkan pola konfigurasi kegagalan. Nilai HEP tertinggi yaitu pada task step 4.2 yaitu pengangkatan hatch cover dengan nilai HEP 0,937. Kesalahan dalam menerima informasi yang diberikan TKBM dapat mengakibatkan konsekuensi kegagalan petikemas tidak dapat dimasukkan (loading) ke dalam kapal dan hatch cover jatuh ke bawah yang dapat mengakibatkan accident. Guna mengantisipasi kegagalan tersebut maka dirancang prosedur kesiapan kerja untuk operator STS.rnrnKata Kunci : HRA, HEART, SPAR-H, FTA, prosedur kesiapan kerja


Deskripsi Lain

The loading and unloading process of PT Terminal Teluk Lamong operates for 24 hours for 7 days and is equipped with several heavy cranes in the loading and unloading process. Heavy crane equipment is critical equipment in the process of loading and unloading containers at PT Terminal Teluk Lamong in the form of Ship To Shore (STS). The productivity of STS is highly dependent on human labor the operator. During the operation process, the equipment is vulnerable to the risk of human error. To prevent the risk of human error, the reliability level of STS operators is measured using the Human Reliability Assessment method using the Human Error Assessment and Reduction Technique (HEART) method and Simplified Plant Analysis Risk Human Reliability (SPAR-H). Depiction of failure patterns is done using the Fault Tree Analysis (FTA) method to describe the failure configuration pattern. The highest HEP value is in task step 4.2, namely lifting the hatch cover with an HEP value of 0.937. Errors in receiving information provided by TKBM can result in the consequence of failure that the container cannot be loaded onto the ship and the hatch cover falls which can result in an accident. To anticipate these failures, a work readiness for STS operators was designed.rnrnKeywords: HRA, HEART, SPAR-H, FTA, work readiness

Kontributor: NACHNUL ANSORI, ST., MT TRISITA NOVIANTI, S.TP., MT
Tanggal tercipta: 2024-07-09
Jenis(Tipe): Text
Bentuk(Format): pdf
Bahasa: Indonesia
Pengenal(Identifier): TRUNOJOYO-Tugas Akhir-32649
No Koleksi: 200421100020


Ketentuan (Rights) :
2024

 Download File Penyerta (khusus anggota terdaftar)

 File PDF  1. TRUNOJOYO-Tugas Akhir-32649-ABSTRAK.pdf - 10 KB
 File PDF  2. TRUNOJOYO-Tugas Akhir-32649-COVER.pdf - 1151 KB
 File PDF  3. TRUNOJOYO-Tugas Akhir-32649-CHAPTER 1.pdf - 28 KB
 File PDF  4. TRUNOJOYO-Tugas Akhir-32649-CHAPTER 2.pdf - 353 KB
 File PDF  5. TRUNOJOYO-Tugas Akhir-32649-CHAPTER 3.pdf - 347 KB
 File PDF  6. TRUNOJOYO-Tugas Akhir-32649-CHAPTER 4.pdf - 912 KB
 File PDF  7. TRUNOJOYO-Tugas Akhir-32649-CONCLUSION.pdf - 10 KB
 File PDF  8. TRUNOJOYO-Tugas Akhir-32649-REFERENCES.pdf - 16 KB
 File PDF  9. TRUNOJOYO-Tugas Akhir-32649-APPENDICES.pdf - 828 KB


 Dokumen sejenis...

     Tidak ada !

 Dokumen yang bertautan...

     Tidak ada !



 Kembali ke Daftar