Anda belum Log-in!
Silahkan Log in
Selamat Datang di Portal Digital Content Publisher
Kamis , 05 November 2026
Perpustakaan sebagai jantung pendidikan tinggi di Indonesia, harus mampu memberi kontribusi yang berarti bagi pelaksanaan proses belajar mengajar di perguruan tinggi.
di-posting oleh 210431100022 pada 2025-04-21 09:04:22 • 185 klik
Analisis Efisiensi Daya Pembangkit Listrik Tenaga Mikrohidro (Pltmh) Gunung Sawur 2 Di Desa Sumberwuluh Kecamatan Candipuro Kabupaten Lumajang
Efficiency Analysis Of Micro-Hydro Power Plant Gunung Sawur 2 In Sumberwuluh Village Candipuro District Lumajang Regency
disusun oleh NICOLAS ARDI EKA PERMANA
| Subyek: | Pembangkit listrik tenaga microhidro efisiensi daya simulasi homer perhitungan Matlab |
| Kata Kunci: | efisiensi daya efisiensi turbin rugi daya head loss simulasi HOMER |
[ Anotasi Abstrak ]
Penelitian ini bertujuan untuk menganalisis efisiensi daya dan kinerja sistem Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Gunung Sawur 2 yang berlokasi di Desa Sumberwuluh, Kecamatan Candipuro, Kabupaten Lumajang. Data yang dianalisis meliputi debit air, head, efisiensi turbin, efisiensi generator, rugi-rugi daya, serta head loss, dengan metode perhitungan manual dan simulasi perangkat lunak HOMER. Hasil penelitian menunjukkan rata-rata efisiensi daya PLTMH berkisar antara 68,06% hingga 74,93%, dengan efisiensi turbin sebesar 70,31%. Rugi daya total generator berkisar antara 1.398,39 watt hingga 5.081,41 watt, dengan rata-rata efisiensi generator sebesar 83,22%. Pengukuran head loss akibat gesekan dalam pipa dan sambungan mencapai 1,492 meter dari total tinggi head 6 meter. Simulasi HOMER menghasilkan daya keluaran rata-rata sebesar 15,1 kW, dengan total produksi tahunan 132.704 kWh dan surplus energi sebesar 72.318 kWh yang dijual ke jaringan PLN.
Deskripsi Lain
This study aims to analyze the power efficiency and performance of the Gunung Sawur 2 Microhydro Power Plant (PLTMH) system located in Sumberwuluh Village, Candipuro District, Lumajang Regency. The data analyzed include water discharge, head, turbine efficiency, generator efficiency, power losses, and head loss, using manual calculation methods and HOMER software simulations. The results showed that the average power efficiency of the PLTMH ranged from 68.06% to 74.93%, with a turbine efficiency of 70.31%. The total generator power loss ranged from 1,398.39 watts to 5,081.41 watts, with an average generator efficiency of 83.22%. Measurement of head loss due to friction in pipes and connections reached 1,492 meters from a total head height of 6 meters. The HOMER simulation produced an average output power of 15.1 kW, with a total annual production of 132,704 kWh and an energy surplus of 72,318 kWh sold to the PLN grid.
| Kontributor | : Diana Rahmawati, ST.,MT.; Riza Alfita, ST.,MT. |
| Tanggal tercipta | : 2025-03-12 |
| Jenis(Tipe) | : Text |
| Bentuk(Format) | |
| Bahasa | : Indonesia |
| Pengenal(Identifier) | : TRUNOJOYO-Tugas Akhir-35496 |
| No Koleksi | : 210431100022 |
Ketentuan (Rights) :
2025
Download File Penyerta (khusus anggota terdaftar)
1. TRUNOJOYO-Tugas Akhir-35496-Abstract.pdf - 54 KB
2. TRUNOJOYO-Tugas Akhir-35496-Cover.pdf - 887 KB
3. TRUNOJOYO-Tugas Akhir-35496-Chapter1.pdf - 143 KB
4. TRUNOJOYO-Tugas Akhir-35496-Chapter2.pdf - 779 KB
5. TRUNOJOYO-Tugas Akhir-35496-Chapter3.pdf - 189 KB
6. TRUNOJOYO-Tugas Akhir-35496-Chapter4.pdf - 859 KB
7. TRUNOJOYO-Tugas Akhir-35496-Conclusion.pdf - 54 KB
8. TRUNOJOYO-Tugas Akhir-35496-References.pdf - 180 KB
9. TRUNOJOYO-Tugas Akhir-35496-Appendices.pdf - 1817 KB
Dokumen sejenis...Tidak ada !
Dokumen yang bertautan...- Perancangan Alat Percobaan Fenomena Head Loss Pada Instalasi Pipa Air
- PERANCANGAN DAN ANALISA PENDISTRIBUSIAN DAYA PEMBANGKIT LISTRIK TENAGA MIKROHIDRO PADA WISATA GROJOKAN LIMO PASURUAN
- Analisis Efisiensi Daya Pembangkit Listrik Tenaga Mikrohidro (Pltmh) Gunung Sawur 2 Di Desa Sumberwuluh Kecamatan Candipuro Kabupaten Lumajang
- ANALISIS EFISIENSI TRANSFORMATOR DISTRIBUSI PADA UP3 GRESIK PT PLN PERSERO MENGGUNALAN SOFTWARE ETAP
- ANALISIS EFISIENSI DISTRIBUSI DAYA LISTRIK PADA INSTALASI LVMDP DI PABRIK PUPUK NPK PT. PETROKIMIA GRESIK
Kembali ke Daftar 