Anda belum Log-in!
Silahkan Log in

Selamat Datang di Portal Digital Content Publisher
Kamis , 05 November 2026

Perpustakaan sebagai jantung pendidikan tinggi di Indonesia, harus mampu memberi kontribusi yang berarti bagi pelaksanaan proses belajar mengajar di perguruan tinggi.

TRUNOJOYO » Tugas Akhir & Skripsi » Teknik Elektro
di-posting oleh 210431100022 pada 2025-04-21 09:04:22  •  185 klik

Analisis Efisiensi Daya Pembangkit Listrik Tenaga Mikrohidro (Pltmh) Gunung Sawur 2 Di Desa Sumberwuluh Kecamatan Candipuro Kabupaten Lumajang
Efficiency Analysis Of Micro-Hydro Power Plant Gunung Sawur 2 In Sumberwuluh Village Candipuro District Lumajang Regency

disusun oleh NICOLAS ARDI EKA PERMANA


Subyek: Pembangkit listrik tenaga microhidro
efisiensi daya
simulasi homer
perhitungan Matlab
Kata Kunci: efisiensi daya
efisiensi turbin
rugi daya
head loss
simulasi HOMER

[ Anotasi Abstrak ]

Penelitian ini bertujuan untuk menganalisis efisiensi daya dan kinerja sistem Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Gunung Sawur 2 yang berlokasi di Desa Sumberwuluh, Kecamatan Candipuro, Kabupaten Lumajang. Data yang dianalisis meliputi debit air, head, efisiensi turbin, efisiensi generator, rugi-rugi daya, serta head loss, dengan metode perhitungan manual dan simulasi perangkat lunak HOMER. Hasil penelitian menunjukkan rata-rata efisiensi daya PLTMH berkisar antara 68,06% hingga 74,93%, dengan efisiensi turbin sebesar 70,31%. Rugi daya total generator berkisar antara 1.398,39 watt hingga 5.081,41 watt, dengan rata-rata efisiensi generator sebesar 83,22%. Pengukuran head loss akibat gesekan dalam pipa dan sambungan mencapai 1,492 meter dari total tinggi head 6 meter. Simulasi HOMER menghasilkan daya keluaran rata-rata sebesar 15,1 kW, dengan total produksi tahunan 132.704 kWh dan surplus energi sebesar 72.318 kWh yang dijual ke jaringan PLN.


Deskripsi Lain

This study aims to analyze the power efficiency and performance of the Gunung Sawur 2 Microhydro Power Plant (PLTMH) system located in Sumberwuluh Village, Candipuro District, Lumajang Regency. The data analyzed include water discharge, head, turbine efficiency, generator efficiency, power losses, and head loss, using manual calculation methods and HOMER software simulations. The results showed that the average power efficiency of the PLTMH ranged from 68.06% to 74.93%, with a turbine efficiency of 70.31%. The total generator power loss ranged from 1,398.39 watts to 5,081.41 watts, with an average generator efficiency of 83.22%. Measurement of head loss due to friction in pipes and connections reached 1,492 meters from a total head height of 6 meters. The HOMER simulation produced an average output power of 15.1 kW, with a total annual production of 132,704 kWh and an energy surplus of 72,318 kWh sold to the PLN grid.

Kontributor: Diana Rahmawati, ST.,MT.; Riza Alfita, ST.,MT.
Tanggal tercipta: 2025-03-12
Jenis(Tipe): Text
Bentuk(Format): pdf
Bahasa: Indonesia
Pengenal(Identifier): TRUNOJOYO-Tugas Akhir-35496
No Koleksi: 210431100022


Ketentuan (Rights) :
2025

 Download File Penyerta (khusus anggota terdaftar)

 File PDF  1. TRUNOJOYO-Tugas Akhir-35496-Abstract.pdf - 54 KB
 File PDF  2. TRUNOJOYO-Tugas Akhir-35496-Cover.pdf - 887 KB
 File PDF  3. TRUNOJOYO-Tugas Akhir-35496-Chapter1.pdf - 143 KB
 File PDF  4. TRUNOJOYO-Tugas Akhir-35496-Chapter2.pdf - 779 KB
 File PDF  5. TRUNOJOYO-Tugas Akhir-35496-Chapter3.pdf - 189 KB
 File PDF  6. TRUNOJOYO-Tugas Akhir-35496-Chapter4.pdf - 859 KB
 File PDF  7. TRUNOJOYO-Tugas Akhir-35496-Conclusion.pdf - 54 KB
 File PDF  8. TRUNOJOYO-Tugas Akhir-35496-References.pdf - 180 KB
 File PDF  9. TRUNOJOYO-Tugas Akhir-35496-Appendices.pdf - 1817 KB


 Dokumen sejenis...

     Tidak ada !

 Dokumen yang bertautan...





 Kembali ke Daftar