Anda belum Log-in!
Silahkan Log in
Selamat Datang di Portal Digital Content Publisher
Jumat , 06 November 2026
Perpustakaan sebagai jantung pendidikan tinggi di Indonesia, harus mampu memberi kontribusi yang berarti bagi pelaksanaan proses belajar mengajar di perguruan tinggi.
di-posting oleh 210421100051 pada 2026-01-11 10:01:51 • 91 klik
PENJADWALAN PROYEK PEMBANGUNAN RUMAH TIPE 30/60 MENGGUNAKAN METODE PERT (PROGRAM EVALUATION AND REVIEW TECHNIQUE) (Studi Kasus : PT. Kokoh Exa Nusantara Tbk)`
PROJECT SCHEDULING OF TYPE 30/60 HOUSE CONSTRUCTION USING THE ERT (PROGRAM EVALUATION AND REVIEW TECHNIQUE) METHOD (Case study: PT. Kokoh Exa Nusantara Tbk)
disusun oleh RIKAZ GHALI
| Subyek: | MANAJEMEN PROYEK KONSTRUKSI - PENJADWALAN PROYEK - METODE PERT |
| Kata Kunci: | PERT project scheduling critical path probability construction. |
[ Anotasi Abstrak ]
Proyek konstruksi rumah subsidi merupakan aktivitas yang membutuhkan perencanaan waktu yang akurat agar seluruh rangkaian pekerjaan dapat diselesaikan sesuai target. PT. Kokoh Exa Nusantara Tbk pada tahun 2024 mengalami keterlambatan dalam pembangunan rumah tipe 30/60 akibat ketidakteraturan urutan aktivitas, kendala teknis di lapangan, serta ketidakpastian durasi pelaksanaan. Penelitian ini bertujuan menyusun penjadwalan proyek secara sistematis menggunakan metode Program Evaluation and Review Technique (PERT) untuk menentukan waktu mulai dan selesai setiap aktivitas, mengidentifikasi jalur kritis, menghitung durasi total proyek, serta menganalisis probabilitas penyelesaian proyek tepat waktu. Penelitian dilakukan melalui identifikasi seluruh aktivitas pekerjaan, penyusunan Work Breakdown Structure (WBS), penentuan hubungan ketergantungan antar aktivitas, serta perhitungan durasi menggunakan tiga estimasi waktu PERT, yaitu optimis (o), paling mungkin (m), dan pesimis (p). Nilai Early Start (ES), Early Finish (EF), Late Start (LS), dan Late Finish (LF) diperoleh melalui perhitungan maju dan mundur, yang kemudian digunakan untuk menentukan lintasan kritis. Analisis probabilitas penyelesaian proyek dilakukan dengan pendekatan distribusi normal berdasarkan nilai deviasi standar dan varian pada jalur kritis. Hasil penelitian menunjukkan bahwa jalur kritis proyek berada pada rangkaian aktivitas aktivitas (A-B-C-D-E-F-G-H-I-J-M-N-O-Q-V-W-Z-AA-AB-AC), dengan total durasi harapan (µₚ) sebesar 47 hari. Nilai standar deviasi jalur kritis adalah 1,69 hari, dan berdasarkan analisis probabilitas, proyek memiliki peluang 84% untuk diselesaikan dalam waktu 60 hari. Temuan ini menunjukkan bahwa metode PERT mampu memberikan estimasi waktu yang realistis serta efektif dalam membantu pengendalian aktivitas kritis agar proyek dapat diselesaikan sesuai rencana.
Deskripsi Lain
Subsidized housing construction projects require accurate time planning to ensure that all work activities can be completed according to schedule. In 2024, PT Kokoh Exa Nusantara Tbk experienced delays in constructing type 30/60 housing units due to unstructured activity sequences, technical constraints in the field, and uncertainties in activity duration. This study aims to develop a systematic project schedule using the Program Evaluation and Review Technique (PERT) to determine the start and finish times of each activity, identify the critical path, calculate the total project duration, and analyze the probability of on-time project completion. The research was conducted by identifying all project activities, developing a Work Breakdown Structure (WBS), determining precedence relationships, and calculating activity durations using the three PERT time estimates: optimistic (o), most likely (m), and pessimistic (p). Early Start (ES), Early Finish (EF), Late Start (LS), and Late Finish (LF) were obtained through forward and backward pass calculations and used to identify the critical path. The probability of project completion was analyzed using a normal distribution based on the standard deviation and variance of the critical path activities. The results show that the project’s critical path consists of activities aktivitas (A-B-C-D-E-F-G-H-I-J-M-N-O-Q-V-W-Z-AA-AB-AC),, with a total expected duration (µₚ) of 47 days. The standard deviation of the critical path is 1,69 days, and the probability analysis indicates a 84% chance of completing the project within the 60-day target. These findings demonstrate that the PERT method provides realistic time estimates and effectively supports the control of critical activities to ensure timely project completion.
| Kontributor | : Samsul Amar, ST., M.Sc ;Issa Dyah Utami, ST. MT. |
| Tanggal tercipta | : 2026-01-12 |
| Jenis(Tipe) | : Text |
| Bentuk(Format) | |
| Bahasa | : Indonesia |
| Pengenal(Identifier) | : TRUNOJOYO-Tugas Akhir-38620 |
| No Koleksi | : 210421100051 |
| No Klasifikasi | : 690.068 3 RIK p |
Ketentuan (Rights) :
2026
Download File Penyerta (khusus anggota terdaftar)
1. TRUNOJOYO-Tugas Akhir-38620-Abstract.pdf - 214 KB
2. TRUNOJOYO-Tugas Akhir-38620-Cover.pdf - 835 KB
3. TRUNOJOYO-Tugas Akhir-38620-Chapter1.pdf - 244 KB
4. TRUNOJOYO-Tugas Akhir-38620-Chapter2.pdf - 546 KB
5. TRUNOJOYO-Tugas Akhir-38620-Chapter3.pdf - 296 KB
6. TRUNOJOYO-Tugas Akhir-38620-Chapter4.pdf - 666 KB
7. TRUNOJOYO-Tugas Akhir-38620-Conclusion.pdf - 172 KB
8. TRUNOJOYO-Tugas Akhir-38620-References.pdf - 161 KB
9. TRUNOJOYO-Tugas Akhir-38620-Appendices.pdf - 591 KB
Dokumen sejenis...Tidak ada !
Dokumen yang bertautan...Tidak ada !
Kembali ke Daftar 