Anda belum Log-in!
Silahkan Log in
Selamat Datang di Portal Digital Content Publisher
Kamis , 05 November 2026
Perpustakaan sebagai jantung pendidikan tinggi di Indonesia, harus mampu memberi kontribusi yang berarti bagi pelaksanaan proses belajar mengajar di perguruan tinggi.
di-posting oleh 210431100083 pada 2026-06-16 01:06:04 • 32 klik
ANALISIS PERENCANAAN PEMBANGKIT LISTRIK TENAGA BAYU (PLTB) BERBASIS HOMER DENGAN PERBANDINGAN DUA TITIK DI DESA SEKIDANG LAMONGAN
HOMER-BASED WIND POWER PLANT (PLTB) DESIGN ANALYSIS WITH TWO-POINT COMPARISON IN SEKIDANG VILLAGE, LAMONGAN
disusun oleh ABDUL AZIZ AGUS RIFAI
| Subyek: | Pembangkit Listrik Tenaga Bayu Energi Angin Distribusi Weibull Wind Rose HOMER Energy |
| Kata Kunci: | Pembangkit Listrik Tenaga Bayu Energi Angin Distribusi Weibull Wind Rose HOMER Energy |
[ Anotasi Abstrak ]
Penelitian ini bertujuan untuk menganalisis potensi energi angin dan merencanakan sistem Pembangkit Listrik Tenaga Bayu (PLTB) mandiri di Desa Sekidang, Kabupaten Lamongan, dengan membandingkan dua lokasi berbeda menggunakan perangkat lunak HOMER Energy. Analisis data angin dilakukan melalui Distribusi Weibull dan Wind Rose untuk menentukan potensi teknis serta arah angin dominan. Hasil simulasi menunjukkan bahwa konfigurasi sistem yang terdiri dari turbin angin AWS650W, baterai 1kWh LA, dan inverter AJ 500-12 paling efektif diterapkan di Lokasi 2 karena memiliki produksi energi yang lebih tinggi (1.090 kWh/tahun) dan stabilitas arah angin yang lebih baik dibandingkan Lokasi 1. Secara ekonomi, Lokasi 2 juga lebih efisien dengan nilai Net Present Cost (NPC) sebesar Rp19.743.082 dan Levelized Cost of Energy (LCOE) sebesar Rp17.419 per kWh, sehingga direkomendasikan sebagai titik prioritas pembangunan PLTB untuk memenuhi kebutuhan beban lampu penerangan jalan umum di wilayah tersebut.rnKata kunci: Pembangkit Listrik Tenaga Bayu, Energi Angin, Distribusi Weibull, Wind Rose, HOMER Energy
Deskripsi Lain
This study aims to analyze wind energy potential and plan an independent wind power plant (PLTB) system in Sekidang Village, Lamongan Regency, by comparing two different locations using HOMER Energy software. Wind data analysis was performed using the Weibull and Wind Rose distributions to determine the technical potential and dominant wind direction. Simulation results show that the system configuration consisting of an AWS650W wind turbine, a 1kWh LA battery, and an AJ 500-12 inverter is most effective for Location 2 due to its higher energy production (1,090 kWh/year) and better wind direction stability compared to Location 1. Economically, Location 2 is also more efficient with a Net Present Cost (NPC) of Rp19,743,082 and a Levelized Cost of Energy (LCOE) of Rp17,419 per kWh, making it recommended a priority for wind farm development to meet the needs of public street lighting in the area.rnKeywords: Wind Power Generation, Wind Energy, Weibull Distribution, Wind Rose, HOMER Energy
| Kontributor | : Dian Neipa Purnamasari, S.ST, M.Tr Monika Faswia Fahmi, S.P.D., M.T. |
| Tanggal tercipta | : 2026-02-12 |
| Jenis(Tipe) | : Text |
| Bentuk(Format) | |
| Bahasa | : Indonesia |
| Pengenal(Identifier) | : TRUNOJOYO-Tugas Akhir-39810 |
| No Koleksi | : 210431100083 |
Sumber :
Fakultas Teknik Elektro Universitas Trunojoyo Madura
Ketentuan (Rights) :
Bangkalan, 10 Juni 2026
Download File Penyerta (khusus anggota terdaftar)
1. TRUNOJOYO-Tugas Akhir-39810-Abstract.pdf - 174 KB
2. TRUNOJOYO-Tugas Akhir-39810-Cover.pdf - 1066 KB
3. TRUNOJOYO-Tugas Akhir-39810-Chapter1.pdf - 148 KB
4. TRUNOJOYO-Tugas Akhir-39810-Chapter2.pdf - 554 KB
5. TRUNOJOYO-Tugas Akhir-39810-Chapter3.pdf - 639 KB
6. TRUNOJOYO-Tugas Akhir-39810-Chapter4.pdf - 1589 KB
7. TRUNOJOYO-Tugas Akhir-39810-Conclusion.pdf - 137 KB
8. TRUNOJOYO-Tugas Akhir-39810-References.pdf - 123 KB
9. TRUNOJOYO-Tugas Akhir-39810-Appendices.pdf - 501 KB
Dokumen sejenis...Tidak ada !
Dokumen yang bertautan...
Kembali ke Daftar 