Anda belum Log-in!
Silahkan Log in

Selamat Datang di Portal Digital Content Publisher
Sabtu , 23 November 2024

Perpustakaan sebagai jantung pendidikan tinggi di Indonesia, harus mampu memberi kontribusi yang berarti bagi pelaksanaan proses belajar mengajar di perguruan tinggi.

TRUNOJOYO » Tugas Akhir & Skripsi » Industri
di-posting oleh 090421100101 pada 2013-08-01 09:09:51  •  1033 klik

STUDI KOMPARATIF METODE PENJADWALAN PRODUKSI N JOB PADA M MESIN DENGAN POLA ALIR FLOW SHOP(Studi Kasus: UD. Tunas Sejati)
COMPARATIVE STUDY OF PRODUCTION SCHEDULING METHOD N JOB FOR M MACHINE WITH FLOW SHOP(Case Study : UD. Tunas Sejati)

disusun oleh DITA AGUSTINA WULAN SARI


SubyekPenjadwalan
Makespan
Kata KunciDudeck Teuton Smith
Palmer
Dannenbring
Penjadwalan
Makespan

[ Anotasi Abstrak ]

Penelitian ini membahas mengenai alternatif penjadwalan produksi yang optimal dengan menggunakan metode Dudeck Teuton Smith, Palmer, dan Dannenbring yang bertujuan untuk menentukan penjadwalan yang tepat dan efektif pada UD Tunas Sejati dalam meminimasi makespan. Hasil perhitungan dari ketiga metode tersebut akan dibandingkan dengan metode yang digunakan oleh perusahaan yaitu FCFS (First Come First Served). Penelitian ini diawali dengan menghitung masing-masing waktu proses dari tiap mesin, kemudian dilakukan penjadwalan dengan menggunakan ketiga metode. Berdasarkan perhitungan dengan menggunakan tiga metode menunjukkan bahwa metode Dudeck Teuton Smith dan Dannenbring yang memberikan hasil yang optimal yaitu dengan nilai makespan sebesar 1621,89 menit, rata-rata waktu menganggur sebesar 709,56 menit dan utilitas mesin sebesar 56,25%. Nilai dari kedua metode tersebut lebih baik dibandingkan dengan metode yang digunakan perusahaan selama ini yaitu 1622,62 menit, rata-rata waktu menganggur sebesar 710,29 menit dan utilitas mesin sebesar 56,23%. Kata kunci : Dudeck Teuton Smith, Palmer, Dannenbring, Penjadwalan, Makespan.


Deskripsi Lain

This study discusses the optimal production scheduling alternatives using Dudeck Teuton Smith, Palmer, and Dannenbring which aims to determine the proper scheduling and effective at UD Tunas Sejati in minimizing makespan. The results of these three methods will be compared to the method used by the company is FCFS (First Come First Served). This study begins by calculating each of the processing time of each machine, and then the scheduling is done using three methods. Based on calculations using the three methods show that the method Dudeck Teuton Smith and Dannenbring that provide optimal results, namely the makespan value of 1621,8 minutes, the average idle time for 709,56 minutes and a utility machine is 56,25%. The value of both methods is better than the method used by the company so far is 1622,62 minutes, the average idle time for 710,29 minutes waiting and utility machinery is 56,23%. Keywords: Dudeck Teuton Smith, Palmer, Dannenbring, scheduling, makespan.

Kontributor: IMRON KUSWANDI,S.T.,M.T; SUGENG PURWOKO,S.T.,M.T
Tanggal tercipta: 2013-07-30
Jenis(Tipe): Text
Bentuk(Format): pdf
Bahasa: Indonesia
Pengenal(Identifier): TRUNOJOYO-Tugas Akhir-4499
No Koleksi: 090421100101


Ketentuan (Rights) :
2013

 Download File Penyerta (khusus anggota terdaftar)

 File PDF  1. TRUNOJOYO-Tugas Akhir-4499-ABSTRAK_090421100101.pdf - 157 KB
 File PDF  2. TRUNOJOYO-Tugas Akhir-4499-COVER_090421100101.pdf - 828 KB
 File PDF  3. TRUNOJOYO-Tugas Akhir-4499-BAB I_090421100101.pdf - 90 KB
 File PDF  4. TRUNOJOYO-Tugas Akhir-4499-BAB II_090421100101.pdf - 362 KB
 File PDF  5. TRUNOJOYO-Tugas Akhir-4499-BAB III_090421100101.pdf - 250 KB
 File PDF  6. TRUNOJOYO-Tugas Akhir-4499-BAB IV_090421100101.pdf - 676 KB
 File PDF  7. TRUNOJOYO-Tugas Akhir-4499-BAB V_090421100101.pdf - 9 KB
 File PDF  8. TRUNOJOYO-Tugas Akhir-4499-DAFTAR PUSTAKA_090421100101.pdf - 194 KB
 File PDF  9. TRUNOJOYO-Tugas Akhir-4499-LAMPIRAN_090421100101.pdf - 407 KB


 Dokumen sejenis...

     Tidak ada !

 Dokumen yang bertautan...





 Kembali ke Daftar