Manajemen Proyek Pembangunan Gedung Laboratorium Universitas Trunojoyo Dengan Pendekatan (CPM) Critical Path Method
Project Management Building University Laboratory Trunojoyo Madura With Approach (CPM) Critical Path Method
disusun oleh MOH AMIEN NUR RAHMAN
| Subyek: | manajemen proyek dengan pendekatan CPM |
| Kata Kunci: | manajemen proyek jaringan kerja metode CPM (Critical Path Method) biaya percepatan |
[ Anotasi Abstrak ]
Penelitian ini membahas tentang manajemen proyek pembangunan gedung Lab. UTM dengan pendekatan CPM (Critical Path Method). Tuntutan pembangunan di segala bidang semakin ditingkatkan, terutama di bidang pendidikan, hal ini dilakukan dalam rangka meningkatkan kenyaman dalam menuntut ilmu bagi masyarakat. Banyak kemajuan yang harus diraih. Tujuan dalam penelitian ini adalah Menentukan jaringan kerja atau network proyek, Menganalisis kebutuhan waktu dan sumber daya yang optimal, Menganalisis perkiraan scenario percepatan proyek berkaitan dengan biaya tenaga kerja. Untuk memperoleh manajemen proyek maka menggunakan metode CPM (Critical Path Method). Hasil penelitian ini yaitu terdapat 78 jalur kritis dan 60 waktu longgar, dilakukan pengoptimalan waktu dan percepatan waktu pada kegiatan yang mempunyai waktu longgar serta dilakukan kerja lembur untuk pengoptimalan waktu yaitu tanggal (17,26,28 november 2013) dan (01,10 desember 2013). Pada jadwal sebelumnya menghabiskan biaya sebesar Rp. 16.170.000 dan hasil dari penelitian menggunakan critical path method menghabiskan biaya total Rp.19.557.000 dengan percepatan waktu 4 hari dengan selisih harga sebesar Rp. 3.387.000
Deskripsi Lain
This study discusses the building of project management Lab. UTM approach using CPM ( Critical Path Method ) . Demands of development in all areas be improved , especially in the field of education , this is done in order to improve the comfort for the people in their studies . A lot of progress to be achieved . The purpose of this research is Determining networks or the network project , analyzing the needs of the time and resources optimally , project acceleration analyzing scenario estimates relating to labor costs . To obtain the project management method CPM ( Critical Path Method ) . The results of this research that there are the critical path 78 and 60 times is, done the optimazing time and time acceleration on activities that have a spare time and overtime work performed for the optimization of time ie date ( 17,26,28 november 2013) and ( 01,10 december 2013 ) . In the previous schedule at a cost of Rp . 16.17 million and the results of research using critical path method spending cost Rp.19.557.000 with acceleration time of 4 days with a price difference of Rp . 3.387 million
| Kontributor | : MU'ALIM,ST.,MT;ARIBASUKI,ST.,MT |
| Tanggal tercipta | : 2014-01-24 |
| Jenis(Tipe) | : Text |
| Bentuk(Format) | |
| Bahasa | : Indonesia |
| Pengenal(Identifier) | : TRUNOJOYO-Tugas Akhir-5172 |
| No Koleksi | : 090421100047 |
Relasi/Tautan:
manajemen proyek
Ketentuan (Rights) :
24 januari 2014
Download File Penyerta (khusus anggota terdaftar)
1. TRUNOJOYO-Tugas Akhir-5172-Abstrak.pdf - 86 KB
2. TRUNOJOYO-Tugas Akhir-5172-COVER.pdf - 788 KB
3. TRUNOJOYO-Tugas Akhir-5172-Chapter 1.pdf - 100 KB
4. TRUNOJOYO-Tugas Akhir-5172-Chapter 2.pdf - 688 KB
5. TRUNOJOYO-Tugas Akhir-5172-Chapter 3.pdf - 181 KB
6. TRUNOJOYO-Tugas Akhir-5172-Chapter 4.pdf - 846 KB
7. TRUNOJOYO-Tugas Akhir-5172-Chapter 5.pdf - 87 KB
8. TRUNOJOYO-Tugas Akhir-5172-Reference.pdf - 154 KB
9. TRUNOJOYO-Tugas Akhir-5172-Appendicies.pdf - 213 KB
Dokumen sejenis...Tidak ada !
Dokumen yang bertautan...- Penuntun 10 menit manajemen proyek
- Manajemen Proyek Pembangunan Gedung Laboratorium Universitas Trunojoyo Dengan Pendekatan (CPM) Critical Path Method
- MANAJEMEN PROYEK PEMBANGUNAN APARTEMEN MENARA RUNGKUT DENGAN PENDEKETAN CRITICAL PATH METHOD dan PERT(Studi Kasus PT. Tata Bumi Raya)
- APLIKASI MANAJEMEN PROYEK BERBASIS WEB MENGGUNAKAN METODE AGILE DENGAN FRAMEWORK SCRUM
- USULAN PERBAIKAN PENJADWALAN PROYEK MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM) DAN CRASHING (Studi Kasus: Produksi Tangki di PT. Metal Hitech Engineering)
Kembali ke Daftar 