Anda belum Log-in!
Silahkan Log in

Selamat Datang di Portal Digital Content Publisher
Minggu , 24 November 2024

Perpustakaan sebagai jantung pendidikan tinggi di Indonesia, harus mampu memberi kontribusi yang berarti bagi pelaksanaan proses belajar mengajar di perguruan tinggi.

TRUNOJOYO » Tugas Akhir & Skripsi » Industri
di-posting oleh 100421100039 pada 2015-02-09 10:49:17  •  777 klik

PERANCANGAN MODEL SIMULASI LINI PRODUKSI SEPATU (Studi Kasus : PT. Widaya Inti Plasma, Sidoarjo)
DESIGN MODEL SIMULATION PRODUCTION LINE SHOES (Case Study : PT . Widaya Inti Plasma , Sidoarjo )

disusun oleh BUDI WILAKSONO


SubyekPemodelan
Simulasi
Proses Produksi Sepatu
Kata KunciSimulasi
WIP
Footware

[ Anotasi Abstrak ]

PT Widaya Inti Plasma merupakan salah satu perusahaan manufaktur yang bergerak dalam bidang footwear, mengenai permasalahan terkait proses produksi terutama pada departemen injection, hal ini dikarenakan mesin yang digunakan bekerja secara otomatis, sehingga pemborosan menghasilkan cacat pada produk yang tidak bisa dihindari. Penelitian ini dilakukan untuk melengkapi kekurangan yang ada pada penelitian sebelumnya yaitu dengan merancang suatu model simulasi dengan tujuan memberikan usulan perbaikan untuk mengoptimalkan sumberdaya produksi, meminimalisasi jumlah antrian, meminimasi work in process (WIP) dan maksimalkanoutput produk yang dihasilkan pada lini produksi sepatu. Berdasarkan hasil pengolahan data didapatkan jumlah antrian tertinggi pada stasiun proses injection sebesar 125 entity dengan nilai utilitas pada mesin sebesar 63% sehingga pada stasiun ini akan dilakukan perbaikan. Setelah usulan perbaikan dilakukan yaitu dengan menambah 4 resource yaitu 3 mesin (1 mesin heating, 1 mesin injection dan1 Mesin cooling) dan 1 tenaga kerja trimming didapatkan hasil penurunan jumlah antrian pada ke 4 resource dengan nilai antrian proses heating sebesar47 entity, injection sebesar 84 entity dan cooling sebesar 42 entity, untuk utilitas mesin pada proses heating sebesar38%, proses injection sebesar 46% dan proses cooling sebesar 24% dan untuk utilitas tenaga kerja pada proses trimming sebesar 36 %.


Deskripsi Lain

PT Widaya Inti Plasma is one of the companies that engaged in manufacturing footwear, of the problems related to the production process particularly on the injection, this is due to the engine being used to work automatically, so a waste produce defects in products that cannot be avoided. This research was conducted to complement the existing shortcomings in previous research that is by design a simulation model with the aim of giving the proposed improvements to optimize resource production, minimize the number of queue, manage the work in process (WIP) and maximizeoutput products produced on a production line of shoes. Based on the results of processing the data obtained the highest number of queues on the injection process of 125 stations entity with a value of utility on the machine of 63% so at this station will be carried out repairs. After the proposed improvements are carried out namely by adding 4 resource i.e. the 3 powerplant (1 engine, 1 injection heating and Engine cooling 1) and 1 was obtained by trimming labor results in a decrease in the number of queue resource with the value to 4 queues process heating by 47 entity, entity injection amounting to 84 and cooling of 42 entity, for utility engines in process heating by 38%the injection process, amounting to 46% and 24% of cooling process and for the utility workforce on trimming process of 36%.

Kontributor: SUGENG PURWOKO, S.T., M.T.;SABARUDIN AKHMAD, S.T., M.T.
Tanggal tercipta: 2014-12-11
Jenis(Tipe): Text
Bentuk(Format): pdf
Bahasa: Indonesia
Pengenal(Identifier): TRUNOJOYO-Tugas Akhir-6288
No Koleksi: 100421100039


Ketentuan (Rights) :
11 Desember 2014

 Download File Penyerta (khusus anggota terdaftar)

 File PDF  1. TRUNOJOYO-Tugas Akhir-6288-Abstract.pdf - 98 KB
 File PDF  2. TRUNOJOYO-Tugas Akhir-6288-Cover.pdf - 586 KB
 File PDF  3. TRUNOJOYO-Tugas Akhir-6288-Chapter 1.pdf - 95 KB
 File PDF  4. TRUNOJOYO-Tugas Akhir-6288-Chapter 2.pdf - 378 KB
 File PDF  5. TRUNOJOYO-Tugas Akhir-6288-Chapter 3.pdf - 137 KB
 File PDF  6. TRUNOJOYO-Tugas Akhir-6288-Chapter 4.pdf - 1459 KB
 File PDF  7. TRUNOJOYO-Tugas Akhir-6288-Chapter 5.pdf - 10 KB
 File PDF  8. TRUNOJOYO-Tugas Akhir-6288-Reference.pdf - 93 KB
 File PDF  9. TRUNOJOYO-Tugas Akhir-6288-Appendices.pdf - 2413 KB


 Dokumen sejenis...

     Tidak ada !

 Dokumen yang bertautan...





 Kembali ke Daftar